Roofing and Cladding Package inclusive of Internal Cladding to Sports Hall, Entrance Stair and Swimming Pool Bulkheads
Client: Fife Sports and Leisure Trust
Main Contractor: Graham Construction
Architect: Cre8 Architecture & B3 Architects
Engineer: Arup
Steel Contractor: Glenfab
Project Value
Roofing and Cladding Contract Value: Circa £2.74m
MEWPS and Roof Edge Protection
Building Height: 15m
Access Strategy:
- Low Level MEWPS and Cherry Pickers
- Roof Edge protection and Haki Stair Access
Cracked Glass Effect Internal Wall
The cracked glass effect wall was a feat. of quality installation and precision. The 122 individual panels were installed with a range of 5mm and 20mm joints to create the aesthetic of a number of large panes of shattered glass.
Unfortunately, the panels, all in white, arrived on-site with the part numbers rubbed off and became the biggest jigsaw our installation team have ever done. To their credit, they got all the pieces in the correct locations and the wall looks fantastic.