Roofing and Cladding Package inclusive of Internal Dustwall and Firewall
Client: FCC Environment
Main Contractor: Hitatchi Zosen-Inova
Architect: Weedon Architects
Engineer: Royal Haskoning DHV
Steel Contractor: Peers
Project Value
Roofing and Cladding Contract Value: Circa £3m
Firewall Variation: Circa £175K
Dust Wall Variation: Circa £25K
Bale Store Building Variation: Circa £200K
Building Height Implications
Building Height: 42m
Access Strategy:
- Low Level MEWPS and Cherry Pickers
- High Level Cradle Access
- On Roof Access by Aluminium Tower
Bespoke External Cladding
Due to the project requirements for:
- Thermal Performance
- Acoustic Performance
- Fire Performance
- Aesthetic Requirements from Planning Conditions
The building required a bespoke wall cladding solution. This was developed with the use of a Euroclad 19/1000 Liner Profile which provided internal continuity. A bespoke engineered subframe was introduced to support the Paroc Panels to meet the aesthetic requirements. The Rodeca posed more of a challenge due to the Fire Performance Implications and therefore this became a triple skin construction whereby a Euroclad trapezoidal wall system was overclad in Rodeca, this allowed us to isolate the Rodeca to the external envelope and protect the internal works. Fire Barriers were included within the cavity to the face of the trapezoidal cladding in order to give surity of fire performance.