Roofing and Cladding Package inclusive of Curtain Wall and Fencing
Client: NDA (Nuclear Decommissioning Authority)
Main Contractor: Morrison Construction
Architect: Reiach & Hall
Engineer: Arup
Steel Contractor: BSB Structural Ltd
Project Value
Roofing and Cladding Contract Value: Circa £2.25m
MEWPS and Roof Edge Protection
Building Height: 12m
Access Strategy:
- Low Level MEWPS and Cherry Pickers
- Roof Edge protection and Internal Stair and Ladder Access
James and Taylor Cladding Panels and KME Copper Cladding Panels with Kawneer Curtain Walling and Icopal Membrane Roofing
Trespa Meteon Cladding Panels with GKD Mesh Overlay, CGL PPC Aluminium Cladding Panels all on Paroc Insulated Wall Panels with Nvelope Substructure.
Trespa Meteon Cladding Panels with Rodeca Polycarbonate Cladding on Paroc Insulated Cladding Panels with Nvelope Substructure. Kalzip standing seam roofs, icopal membrane roof with terrace and green roof over.